Data pull is paused — figures below are a frozen snapshot, not current. This is a portfolio piece, not a maintained product.
GridStrain
← All regions

PJM Interconnection

Mid-Atlantic · Data Center Alley

67%Low strain

Grid Stress Index · demand vs. 1-yr peak

Serves Northern Virginia's Loudoun County, the densest data-center cluster on Earth. The bellwether for AI-driven grid strain.

Grid Stress Index
67%
Batting average
Current demand as a share of the past year's peak. 95%+ means the grid is near its limit.
Peak Load (7d)
138.8 GW
Home runs
The biggest single-hour demand spike over the last week.
Clean Generation
28%
On-base %
Share of generation from wind, solar, hydro, nuclear & geothermal right now.
Fossil Baseline
84.6 GW
Small ball
Power coming from coal, gas & oil — the grid's heavy lifting when renewables dip.

Demand vs. forecast

last 7 days · GW

Amber = actual demand · blue dashed = day-ahead forecast.

Fuel mix

Aug 17, 11:00 PM ET

What's generating the electricity for this hour.

  • Natural Gas52%
  • Nuclear27%
  • Coal17%
  • Other3%
  • Hydro1%
  • Oil1%
  • Wind0%
  • Solar0%

Demand trend

+8% avg demand · 2019–2026

Monthly average demand (amber) with the monthly baseload — the lowest hour of each month (cyan). A rising floor is the signature of always-on data-center load.

Latest demand reading: Aug 18, 9:00 AM ET · 108.4 GW