GridStrain
← All regions

PJM Interconnection

Mid-Atlantic · Data Center Alley

66%Low strain

Grid Stress Index · demand vs. 1-yr peak

Serves Northern Virginia's Loudoun County, the densest data-center cluster on Earth. The bellwether for AI-driven grid strain.

Grid Stress Index
66%
Batting average
Current demand as a share of the past year's peak. 95%+ means the grid is near its limit.
Peak Load (7d)
126.9 GW
Home runs
The biggest single-hour demand spike over the last week.
Clean Generation
40%
On-base %
Share of generation from wind, solar, hydro, nuclear & geothermal right now.
Fossil Baseline
51.6 GW
Small ball
Power coming from coal, gas & oil — the grid's heavy lifting when renewables dip.

Demand vs. forecast

last 7 days

Amber = actual demand · blue dashed = day-ahead forecast.

Fuel mix

Jun 2, 12:00 AM ET

What's generating the electricity for this hour.

  • Natural Gas44%
  • Nuclear37%
  • Coal14%
  • Other2%
  • Wind2%
  • Hydro1%
  • Oil0%
  • Solar0%

Peak demand by year

+5% 20192025

The highest single hour of demand each year. A rising peak is the clearest sign of load growth straining the grid — the latest bar is the year so far.

Latest demand reading: Jun 8, 11:00 AM ET · 105.2 GW