PJM Interconnection

Mid-Atlantic · Data Center Alley

86%High strain

Grid Stress Index · demand vs. 1-yr peak

Serves Northern Virginia's Loudoun County, the densest data-center cluster on Earth. The bellwether for AI-driven grid strain.

Grid Stress Index
86%
Batting average
Current demand as a share of the past year's peak. 95%+ means the grid is near its limit.
Peak Load (7d)
162.6 GW
Home runs
The biggest single-hour demand spike over the last week.
Clean Generation
28%
On-base %
Share of generation from wind, solar, hydro, nuclear & geothermal right now.
Fossil Baseline
91.9 GW
Small ball
Power coming from coal, gas & oil — the grid's heavy lifting when renewables dip.

Demand vs. forecast

last 7 days · GW

Amber = actual demand · blue dashed = day-ahead forecast.

Fuel mix

Jul 3, 11:00 PM ET

What's generating the electricity for this hour.

  • Natural Gas47%
  • Nuclear24%
  • Coal19%
  • Other3%
  • Oil3%
  • Wind3%
  • Hydro1%
  • Solar0%

Demand trend

+8% avg demand · 2019–2026

Monthly average demand (amber) with the monthly baseload — the lowest hour of each month (cyan). A rising floor is the signature of always-on data-center load.

Latest demand reading: Jul 4, 2:00 PM ET · 139.4 GW