← All regions
PJM Interconnection
Mid-Atlantic · Data Center Alley
67%Low strain
Grid Stress Index · demand vs. 1-yr peak
Serves Northern Virginia's Loudoun County, the densest data-center cluster on Earth. The bellwether for AI-driven grid strain.
Grid Stress Index
67%
⚾ Batting average
Current demand as a share of the past year's peak. 95%+ means the grid is near its limit.
Peak Load (7d)
138.8 GW
⚾ Home runs
The biggest single-hour demand spike over the last week.
Clean Generation
28%
⚾ On-base %
Share of generation from wind, solar, hydro, nuclear & geothermal right now.
Fossil Baseline
84.6 GW
⚾ Small ball
Power coming from coal, gas & oil — the grid's heavy lifting when renewables dip.
Demand vs. forecast
last 7 days · GWAmber = actual demand · blue dashed = day-ahead forecast.
Fuel mix
Aug 17, 11:00 PM ETWhat's generating the electricity for this hour.
- Natural Gas52%
- Nuclear27%
- Coal17%
- Other3%
- Hydro1%
- Oil1%
- Wind0%
- Solar0%
Demand trend
+8% avg demand · 2019–2026Monthly average demand (amber) with the monthly baseload — the lowest hour of each month (cyan). A rising floor is the signature of always-on data-center load.
Latest demand reading: Aug 18, 9:00 AM ET · 108.4 GW